Services

main services

1.

Design

Boulema Engeering  has formed strong partnerships with leading design firms in Nigeria. Together, we provide full, integrated design-build services for operations. Our design-build teams offer our clients a guaranteed track record of success.

2.

By ensuring we only use the finest materials, a highly capable labour force and strict supervision policies, BEC has become a company renowned for the quality of our construction projects. We strive to produce results that far exceed the current industry standards in terms of durability and cost efficiency.

3.

Engineering

Our team of in-house engineers pool from over 50 years of combined experience to develop concepts into buildable realities. We also have a drive to stay one step ahead of our competitors by using state of the art technologies and the most up to date construction methods with relevant advances and technologies, allowing us to always deliver the most cost effective and efficient solutions.

 

 

 

5.

Operation and Maintenance

6.

Steelworks in Building Construction

BES in much the same manner employs standardized Structural steel design and construction methods in the execution of all her projects. We usually prepare detail Workshop drawings which are always referenced to the consultant’s structural drawings and general specifications.

Project Approach and Execution Schedule

page3_img1

Project Approach

All aspects of the work, their scheduling, bearing and time-dependent relationship with one another are captured in a computer generated program of work which is usually submitted with the tender bid. The execution of works referenced above will be consistent with normal provisions always included in the trade preambles which form part of “the articles of agreement and conditions of contract”                     

page3_img2

Project Execution Schedule

The time of completion of any given project usually given in the number of weeks is always clearly stated in our tender proposals. The handing over of the completed project is deemed to be included in this time frame except when funding arrangement imposes significant delay.